Caltha LLP Project Summary

Project: Facility SPCC Plan
Client: National Control Equipment Manufacturer
Location(s): Tennessee

Key Elements:  SPCC Plan

Overview: Caltha prepared the Spill Prevention, Control and Countermeasure (SPCC) plan for this metal fabrication and equipment manufacturing facility located in Tennessee to comply with the requirements of 40 CFR 112, Tennessee spill prevention requirements, and Tennessee spill reporting requirements . Caltha staff conducted on on-site inspection to confirm controls and containment required under the SPCC rule were present and being implemented. Caltha prepared the SPCC Plan, SPCC inspection checklists, spill containment discharge logs, SPCC Plan Review log, and other elements required under 40 CFR 112. The SPCC plan was certified by a Tennessee licensed Professional Engineer.